Our power and grounding systems include:
- Direct Burial Ground System—offers the speed and safety of a compression connection while
meeting the IEEE Standard 837-2002 - Power connectors—ensure maximum performance over the service life of the installation. Panduit copper compression lugs and splices are the first network connectors to meet Network Equipment-Building Systems (NEBS) Level 3 Requirements as tested by Telcordia Technologies
- Installation tools—deliver strong, dependable connections
Literature
- White Paper - Optimizing Control Panel Layouts for Noise Mitigation.
- Brochure - Align, converge, and optimize your plant with the Unified Physical Infrastructure Approach from Panduit.